Sunday, March 2, 2008

Let's Get Plastered

Well the bricking is almost finished, seems like forever but the job looks perfect (from me an amateur). The brickies should be finished by the end of the week and the plastering starting soon after. Just the front needs to be finished just waiting for our front door frame to be replaced, it was left in the rain before Christmas and has warped.



The view from the bridge behind us that go ever the wetlands, looks more like a house now.


The infills have been put over some of the windows.




An example of the effort gone into the bricking, much better than some that I have seen including the display homes.



The wall insulation has been put in and all the walls leveled and straightened ready for the plaster.

All the electrical has been roughed in, and some wires for our Home Theatre which I ran myself, our Super is great most Metricon Supers would not let you on-site but it is amazing what a little King Island Cheese will do.




Also at the same time added some extra noggins for toilet roll holders and towel rails.




The heater ducting has also been roughed in and unit has been installed in the ceiling.





The baths and shower bases all installed also.







The view from the kitchen to the Family Room.



Looking to the Kitchen from the Dining Room


The Dining Room, you can see the green paint where the Pre-Plaster inspection was done and that upright needs to be packed out for the plaster.


Looking from the Front Door to the Family Room.







1 comment:

Anonymous said...

You both must be so excited?
Can't wait to sit out on the deck with some wine and cheese.
Oh yeah and check out my bedroom....MG