Sunday, November 11, 2007

More progress this week

We have had quite a busy week considering that it was a short week in Melbourne due to Cup Day.

On Monday the bin and toilet were delivered.



On Wednesday the Meter Box was installed.



On Thursday the water meter installed.



The underground plumbing was done on Saturday.







When the underground works were done on Saturday, the plumber has put this big pink pipe in the middle of where the driveway will be, the red line on the right is the outside of the driveway. We will call our CSC on Monday to see if this is a temporary pipe or permanent, if it is permanent we will ask for it to be moved.



The wetlands are starting to establish their eco-systems now and the local bird life are starting to move in.

1 comment:

May and Ray said...

We have/had a pipe sticking up right in front of the garage door - where we would be driving. We got some red scoria put down (Metricon, not us)on the driveway, and I can't remember seeing it after that. It may be a surface drain that will have a grate cover over it later, or it may be where the downpipes connect to under the ground, and then is covered up. I must look back through our photos... but we were told not to worry, and you're not alone!